Limited Site Disruption

With the ability to phase the construction in many instances, and the limited requirement for staging areas, it is possible to maintain a majority of your existing parking spaces during the construction phase. A small portion of the lot is closed for the erection of the steel columns and framing and the pouring of concrete, then the surface portion of that section is re-opened for parking, as another portion is closed for the erection process. This ability preserves revenue, and lessens the impact on your customers.
The MORE PARK® System is the result of years of careful design and engineering. Two decades of research and field testing of modular short-span decks in Europe led to the creation of a system which utilizes the best features of its predecessors, and makes vital improvements in the area of functionality and durability.
Properly maintained, the MORE PARK® System will provide a long, trouble-free life.